Home > Buy Now > Steel Pipes > A519 Seamless Carbon and Alloy Steel Mechanical Tubing
 


Jiangsu Huacheng Industry Group Co., Ltd
 
icon Boiler-tube Heat-Exchanger Tube and Superheater Tube
icon Seamless and ERW Steel Tube for Pressure Purpose
icon Carbon and Alloy Steel Mechanical and Structure Tubing

line

icon Company Profile
icon Selling Leads

line


icon To Chinese Page


 
Contact us
Jiangsu Huacheng Industry Group Co., Ltd
[China]
Address:
Renmin Road, Tangqiao Town, Zhangjiagang Suzhou Jiangsu 215600 China
Phone:
86-138-12877559
Contact name:
Terry Khu , Business Executive Officer
Inquire now










Jiangsu Huacheng Industry Group Co., Ltd



 
Carbon and Alloy Steel Mechanical and Structure Tubing

A519 Seamless Carbon and Alloy Steel Mechanical Tubing

Inquire now

A519 Seamless Carbon and Alloy Steel Mechanical Tubing

Click to enlarge image

 Origin China
 Model Number HC2009020904

Standard Name:  ASTM A519 - Standard Specification for Seamless Carbon and Alloy Steel Mechanical Tubing

 

Product particular communication:

1) Size: 6.35 - 323.8 mm (OD) x 0.89 - 25mm (WT) ;

2) Tight tolerance, Smooth surface, Uniform mechanical property(Mechanical Properties equilibrium) ;

3) Heat treatment: BK, BKS, GBK, NBK,Stress Relief, Normalizing, Spheroidize Anneal, Annealing, Bright Annealing, Normalized, Quenched and Tempered, etc ;

 4) Continuous stenciling as required ;

 5) Rust prevention treatment, such as: immersion oil, lacquer, passivation, phosphating,etc;

 6) Plastic plugs or caps on both ends as required ;

 7) Packing Type: Round , Square, Rectangle, Hexagon. Streamline, etc.

 8) Relevant Test: Chemical Component Analysis,Mechanical Properties(Ultimate tensile strength,Yield strength,Elongation),Technics Properties(Flattening Test,Flaring Test,Bending Test,Hardness Test,Blow Test,etc), Exterior Size Inspection, Nondestructive Test,Hydrostatic Test;

 9) Main Applications: Automobile and Bearing Industry, Mechanical and Structral Purpose, Hydraulic and Petrochemical Purpose, etc.

  


Mobile: +86 138 128 775 59 -->Terry(Chief Business Executive Officer)
F a x: +86 512 584 390 33
Email:  tubesolution at sina. com

 

Commercial Information:
  1) Delivery                    :  Within 40 days ;
  2) Min Order                 :  5 Tons Per Item ;
  3) Packing way              :  As per our export standard for shipment ;
  4) Term of payment       :  30% T/T within 3 days after signing the contract, balance 70% before shipment. Or 30%T/T +70% irrepealable L/C ;
  5) Delivery Port              :  Shanghai Port ;
  6) Offer Validity              :  5-7 Days        ;
  7) Container                   :  20' or 40', etc ;
  8) Manufacture methods  :  Cold Finished Method.



icon   Packaging wooden,bundles,etc
icon   Delivery lead time 35day
icon   Minimum order 5T
icon   Supply ability 5000Ton/Month

Inquire now