Home > Buy Now > Steel Pipes > ASTM A312 Stainless Steel Tube
 


Jiangsu Huacheng Industry Group Co., Ltd
 
icon Boiler-tube Heat-Exchanger Tube and Superheater Tube
icon Seamless and ERW Steel Tube for Pressure Purpose
icon Carbon and Alloy Steel Mechanical and Structure Tubing

line

icon Company Profile
icon Selling Leads

line


icon To Chinese Page


 
Contact us
Jiangsu Huacheng Industry Group Co., Ltd
[China]
Address:
Renmin Road, Tangqiao Town, Zhangjiagang Suzhou Jiangsu 215600 China
Phone:
86-138-12877559
Contact name:
Terry Khu , Business Executive Officer
Inquire now










Jiangsu Huacheng Industry Group Co., Ltd



 
Seamless and ERW Steel Tube for Pressure Purpose

ASTM A312 Stainless Steel Tube

Inquire now

ASTM A312 Stainless Steel Tube

Click to enlarge image

 Origin China
 Model Number HC2009020906

Standard Name:  A 312/A 312M  Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes

 

Specification:

1) Tight tolerance, Smooth surface, Uniform mechanical property(Mechanical Properties equilibrium) ;

 

2) Heat treatment: BK, BKS, GBK, NBK,Stress Relief, Normalizing, Spheroidize Anneal, Annealing, Bright Annealing, Normalized, Quenched and Tempered, Solution Annealing, etc ;

 

3) Continuous stenciling as required ;

 

4) Rust prevention treatment, such as: immersion oil, lacquer, passivation, phosphating,etc;

 

5) Plastic plugs or caps on both ends as required ;

 

6) Packaging: Hexagonal bundles of max. 1,500kg with several steel strips, Wrapped in waterproof paper, PVC sleeve,and sackcloth with several steel strips or packed in heavy tri-wall boxes, wooden boxes, wooden slats as requires;Type: Round , Square, Rectangle, Hexagon. Streamline, etc;

 

7) Relevant Test: Chemical Component Analysis,Mechanical Properties(Ultimate tensile strength,Yield strength,Elongation),Technics Properties(Flattening Test,Flaring Test,Bending Test,Hardness Test,Blow Test,etc), Exterior Size Inspection, Nondestructive Test,Hydrostatic Test;

 


Mobile: +86 138 128 775 59 -->Terry(Chief Business Executive Officer)
F a x: +86 512 584 390 33
Email: terry. tube at gmail. com 
        

Commercial Information:
  1) Delivery                    :  Within 35 days ;
  2) Min Order                 :  2 Tons Per Item ;
  3) Packing way              :  As per our export standard for shipment ;
  4) Term of payment       :  30% T/T within 3 days after signing the contract, balance 70% before shipment. Or 30%T/T +70% irrepealable L/C ;
  5) Delivery Port              :  Shanghai Port ;
  6) Offer Validity              :  5-7 Days        ;
  7) Container                   :  20' or 40', etc ;
  8) Manufacture methods  :  Cold Finished Method.



icon   Packaging wooden,bundles,PVC,etc
icon   Delivery lead time 35Day
icon   Minimum order 3Ton/Item tube
icon   Supply ability 4600Ton/Month

Inquire now